Drug Stability Test Chamber

Drug Stability Test Chamber

EMAIL

Special technical services of the case which passed drudgery stability test.

 

Through a series activities such as: DQ (design confirmation), FAT (Manufacturers factory test), IQ (installation qualification), OQ (Operation confirmation), PQ (operating performance confirmation), the data and conclusions can prove that if the equipment can meet the requirements of production process, if equipment performance meet the requirements of design & products and GMP standard.

1. Purpose of DQ: according to customer demand and production process by compare with contract and drawing in order to review equipment performance, material, structure, accessories, control, instrument, etc, to confirm the rationality and reliability of products in design process.

2. Purpose of FAT: through a series of experimental test by manufacture proves the quality and reliability of the equipment before delivery also prove the equipment can satisfy the basic requirements of design confirmation, products standard and international requirements of GMP.

3. Purpose of IQ: by installation, commissioning and validation activitiesa series of data were offered to validate if installation documents & conditions & outcome of drug stability testing case can comply with the design requirements, datum and document can meet the requirements of GMP management.

4. Purpose of OQ: check instrumental and test report supplied by validate side at first, check and test equipment technology parameter, confirm the operation of equipment performance meet the design requirements, and related requirements in accordance with GMP requirements.

5. Purpose of PO: by the qualification of installation and operational confirmation, test corresponding sample based on the specific craft of customer manufacturer, confirm the operation of equipment performance meet the design requirements, and related requirements in accordance with GMP requirements.

The new generations of drug stability test chamber, assemble year’s experience of design and production, and introduce into German technology, breach the defect of existing cast which can not endure long time and continuous operation. It adopting advanced technology of double compressor takes turns switch, and main imported parts performance is stable and reliable.

1. Imported closed compressor, use R134a environmental protection refrigerants, low noise, high efficiency, long service life.

2. Imported touch screen controller, large process control, a precise and reliable control, with R232/R485/USB/LAN interface.

3. Data record, online data acquisition, imported recorder with paper, two data recording mode selection.




INQUIRY

CATEGORIES

CONTACT US

Contact: Mr ZHANGLEI

Phone: +86-17778938919

E-mail: kevin@alp-environment.com

Whatsapp:+86-17778938919

Add: No.260, South Taibai Road, Xi’an, China, 710061